BCU 580 · Edition 11.15l 32
Valve proving system
Program B
Valve V2 opens for the set opening time t
L
. V2 closes
again. During the measurement time t
M
, the tightness
control checks the pressure p
Z
between the valves.
If pressure p
Z
> p
u
/2, valve V1 is leaking.
If pressure p
Z
< p
u
/2, valve V1 is tight. Valve V1 is
opened for the set opening time t
L
. V1 closes again.
During the measurement time t
M
, the tightness control
checks the pressure p
Z
between the valves.
If pressure p
Z
< p
u
/2, valve V2 is leaking.
If pressure p
Z
> p
u
/2, valve V2 is tight.
The tightness test can only be performed if pressure p
d
downstream of V2 is around atmospheric pressure and
the volume downstream of V2 is at least 5 × higher than
the volume between the valves.
t
L
= P59
t
M
= P56
p
Z
>
p
u
2
+
OK
V1
V1
V1
OK
V2
V1
V2
p
Z
>
p
u
2
+
t
L
= P59
t
M
= P56
V2
V2
t
L
= P59
t
M
= P56
+
V2
OK
p
Z
>
p
u
2
V1
OK
V1
V2
V2
V2
p
Z
>
p
u
2
+
t
L
= P59
t
M
= P56
V1
V1
p
Z
>
p
u
2
+
PZ
V1 V2
p
z
p
u
/2