OVERVIEW OF SETTINGS
6.8 Adjusting the hinged flange
After a long period of use, the contact pressure between
boiler doors and boiler body can diminish. This impairs
The boiler is therefore to be periodically checked for leaks
Procedure:
With the boiler door closed, screw lock nut (1, Fig. 27)
forward and tighten; in this way this side becomes the
fulcrum point.
Open lock nut (1) and turn back approx. 1 cm.
ca. 1 cm
Fig. 27
3
1
2
6.9 Lubricating the seal and thread
6.9.1 Lubricating the seal
• Reversing chamber
• Combustion chamber
6.9.2 Lubricating the thread
Apply protective agents if the boiler is out
of service for long periods

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hoval Max-3 plus Series and is the answer not in the manual?

Hoval Max-3 plus Series Specifications

General IconGeneral
BrandHoval
ModelMax-3 plus Series
CategoryBoiler
LanguageEnglish

Related product manuals