EasyManuals Logo

HP 7683 User Manual

HP 7683
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Installation Guide
Making a trial run
12
Making a trial run
Once installation and configuration are complete, make a quick injection using
the sampler to verify that it works properly.
1. Install an empty syringe in the injector.
2. Place empty bottles in the Solvent A and Waste A turret positions. Place an
empty capped sample vial in the tray 1 position (or the turret sample 1
position, if not using the tray).
3. Set these following parameters on the GC:
4. Set the GC oven program to 25°C with a 0°C/min ramp, a hold time of
0.1 minutes, an equilibrium time of 0.3 minutes, and an initial time of
0.3 minutes.
Parameter Setting
Injection volume 1
# Sample pumps 1
Viscosity delay 0
# Sample washes 1
# Solve A washes 1
# Solv B washes 0
Slow plunger off
Pre-dwell time 0
Post-dwell time 0
Sampling offset off (on if cool on-column inlet used)
# Solv A pre-wash 1
# Solv B pre-wash 0
# Injections/vial 1
Samples 1–1 (101–101 for turret with HP ChemStation control)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP 7683 and is the answer not in the manual?

HP 7683 Specifications

General IconGeneral
BrandHP
Model7683
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals