2-2
Installing the Switch
Installation Procedure
Japan Power Cord
Warning
Installation Procedure
1. Prepare the installation site (page 2-3). Please see below for some
installation precautions.
2. Verify the switch passes self test (page 2-4).
3. Mount the switch (page 2-6).
4. Connect power to the switch (page 2-11).
5. Connect the network cables (page 2-11).
Installation Precautions
Follow these precautions when installing the switch.
WARNING
The rack or cabinet should be adequately secured to prevent it
from becoming unstable and/or falling over.
Devices installed in a rack or cabinet should be mounted as low
as possible, with the heaviest devices at the bottom and progres-
sively lighter devices installed above.
When wall mounting, to meet national and international safety
requirements, wall mount either with the front facing up or down.
The side vents cannot be placed up or downward.

Other manuals for HP ProCurve 1810G-24

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProCurve 1810G-24 and is the answer not in the manual?

HP ProCurve 1810G-24 Specifications

General IconGeneral
Form FactorRack-mountable
Switching Capacity48 Gbps
VLAN SupportYes
Throughput35.7 Mpps
MAC Address Table Size8000 entries
Jumbo Frame SupportYes
Input Voltage100-240 VAC
Forwarding Rate35.7 Mpps
ManagementWeb-based management
Uplink Ports2 x SFP
Operating Temperature0°C to 40°C
Operating Humidity15% to 95% non-condensing
Ports24