EasyManua.ls Logo

HP R/T3000 G4 INTL - Rack Installation

HP R/T3000 G4 INTL
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
Page 15
792519-001 Edition 1
ENGLISH
3. Installation
3.3 Tower installation
M3 screws
M3 screw
s
3.4 Rack installation
Warning: To reduce the risk of personal injury or damage to the equipment, be sure that:
The leveling feet are extended to the oor.
The full weight of the rack rests on the leveling feet.
The stabilizing feet are attached to the rack if it is a single-rack installation.
The racks are coupled together in multiple-rack installations.
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
Note: If preparing the rails for integrated shipping, follow the same rack installation instructions.
Note: Mounting hardware for square- and round-holed racks is included in the UPS kit.

Related product manuals