EasyManua.ls Logo

HP Z220 SFF - HP Z820 Workstation Installation Sequence Recommendations

HP Z220 SFF
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HP Z820 Workstation installation sequence recommendations
Table 3-10 Slot installation sequence
Load
order
Card description Type
Slot
0
Slot
1
Slot
2
* Slot
3
* Slot
4
Slot 5 Slot 6
Slot
7
1
1st high performance GPU
Compute card
PCIe-
x16
2nd
1st
1
2
2nd high performance
GPU Compute card
(requires 2nd CPU and
1125w PSU)
PCIe-
x16
Only
3 1st PCIe graphics card
PCIe-
x16
Only
4 2nd PCIe graphics card
PCIe-
x16
2nd
1st
1
5
3rd PCIe graphics
(requires 2nd CPU)
PCIe-
x16
2nd 1st
6
4th PCIe graphics
(requires 2nd CPU and
1125w PSU)
PCIe-
x16
Only
7 Graphics test card
PCIe-
x16
1st 2nd
8 Controller card
PCIe-
x8
2nd 5th 4th 3rd
1st
2
9
Controller card with
battery
PCIe-
x8
2nd 5th 4th 3rd
1st
2
10
PCIe 1394 card PCIe-
x1
Only
11
PCIe audio card PCIe-
x1
1st 4th 5th 2nd 3rd
12
PCIe Network (LAN) PCIe-
x1
1st 4th 5th 2nd 3rd
13 Mini SAS-4x bulkhead kit N/A 1st 2nd
14 eSATA bulkhead kit N/A 1st 2nd
* Slots 3 and 4 require second CPU.
1: If a second graphics card is used with a High Performance GPU Compute card, place the High Performance GPU
Compute card in Slot 6 and the second graphics in the alternate slot(s).
2: If a Controller card is being used with a High Performance GPU Compute card or second graphics card, place the
High Performance GPU Compute card/graphics card in Slot 6 and the RAID card in the alternate slot(s).
NOTE: Slot sequenced from the rear I/O aperture to the board edge.
Component replacement guidelines
93

Table of Contents

Other manuals for HP Z220 SFF

Related product manuals