Procedure
1. Apply the "JBOD3" label to the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. On the moving 2 m SAS cable, replace the "F=1" label
with the "F=3" label.
SAS cable Label color New label
New 0.5 m cable Red J3:D2:IA:P1 - J3:D1:IA:P2
New 0.5 m cable Green J3:D2:IB:P1 - J3:D1:IB:P2
New 1 m cable Red J1:D2:IA:P2 - J3:D1:IA:P1
New 1 m cable Green J1:D2:IB:P2 - J3:D1:IB:P1
Moving 2 m cable (N:S3:P2 - JF:D2:IB:P2) White F=3
3. Cable the second upgrade enclosure (JBOD 3) as shown.
Installing capacity upgrade kits 117