Item Description
1 JBOD 4: Third upgrade enclosure.
2 JBOD 2: First upgrade enclosure.
3 Server node.
4 JBOD 1: Base enclosure.
5 JBOD 3: Second upgrade enclosure.
Item SAS cable Label color Cable from To
6 New 0.5 m cable Red JBOD 4 Drawer 2 IOM A
Port 1
JBOD 4 Drawer 1 IOM A
Port 2
7 New 0.5 m cable Green JBOD 4 Drawer 2 IOM B
Port 1
JBOD 4 Drawer 1 IOM B
Port 2
Table Continued
Installing capacity upgrade kits 119