EasyManua.ls Logo

HPE StoreOnce 5200

HPE StoreOnce 5200
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D = Drawer
I = I/O module
4
3
1
2
Item SAS cable Label color Cable from To
1 0.5 m Red JBOD 1 Drawer 2 IOM A Port 1 JBOD 1 Drawer 1 IOM A Port 2
2 0.5 m Green JBOD 1 Drawer 2 IOM B Port 1 JBOD 1 Drawer 1 IOM B Port 2
3 1 m Red Node Slot 3 Port 1 JBOD 1 Drawer 1 IOM A Port 1
4 2 m Green Node Slot 3 Port 2 JBOD 1 Drawer 2 IOM B Port 2
9. Connect four power cables to the base enclosure. For each drawer, connect each power cable to a
different PDU.
10. Connect the server.
a. Connect the power cables.
Connect each power cable to a separate PDU in the rack.
b. Connect a network cable to LAN port 1.
c. Connect a network cable to the iLO port (recommended).
64 HPE StoreOnce 5250 and 5650 Systems

Table of Contents

Other manuals for HPE StoreOnce 5200

Related product manuals