3. Attach rear hold down brackets by sliding the tab with the arrow pointed forward (1) into the
corresponding slot on the left and right side of the rear of the chassis. Use the black headed thumb
screw to secure tightly to the rail (2).
Cabling capacity upgrade enclosures
Labeling the cables
The StoreOnce capacity upgrade kit (enclosure) includes a sheet of preprinted cable label pairs. Each
pair contains two identical labels, one for each end of the SAS cable.
• N = Node (server node)
• S = Slot
• P = Port
• J = JBOD
• I = I/O module
90 Installing capacity upgrade kits