Apply the correct pair of labels to each SAS cable as you cable the storage enclosure.
Cabling the first capacity upgrade kit (JBOD 2)
The first capacity upgrade kit is located directly above the server node.
Procedure
1. Apply the "JBOD2" label to the top-left pull-out tag at the rear of the enclosure.
2. Apply the cable labels to the new SAS cables.
SAS cable Label color Cable label
New 1 m cable Red N:S6:P1 - J2:I1:P1
New 2 m cable Green N:S6:P2 - JF:I2:P1
White F=2
3. Cable the enclosure as shown.
Figure 29: Cabling the first capacity upgrade kit (JBOD 2)
Item Description
1 JBOD 2: First capacity upgrade kit.
2 Server node.
3 JBOD 1: Base enclosure.
Item SAS cable Label colors Cable from To
4 New 1 m cable Red Node Slot 6 Port 1 JBOD 2 IOM 1 Port 1
5 New 2 m cable Green and White Node Slot 6 Port 2 JBOD 2 IOM 2 Port 1
4. If you are finished installing capacity upgrade kits, skip to Adding power cables.
Cabling the second capacity upgrade kit (JBOD 3)
The second capacity upgrade kit is located directly under JBOD 1.