EasyManua.ls Logo

HPE StoreOnce 5200

HPE StoreOnce 5200
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Item Description
1 JBOD 4: Third capacity upgrade kit.
2 JBOD 2: First capacity upgrade kit.
3 Server node.
4 JBOD 1: Base enclosure.
5 JBOD 3: Second capacity upgrade kit.
6 JBOD 5: Fourth capacity upgrade kit.
Item SAS cable Label colors Cable from To
7 New 0.5 m cable Red JBOD 3 IOM 1 Port 2 JBOD 5 IOM 1 Port 1
8 New 0.5 m cable Green JBOD 5 IOM 2 Port 2 JBOD 3 IOM 2 Port 1
9 Moving 2 m cable Green and white Node Slot 3 Port 2 JBOD 5 IOM 2 Port 1
4. If you are finished installing capacity upgrade kits, skip to Adding power cables.
Cabling the fifth capacity upgrade kit (JBOD 6)
The fifth capacity upgrade kit is the highest in the rack, located directly above JBOD 4.
Procedure
1. Apply the "JBOD6" label to the top-left pull-out tag at the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. On the moving SAS cable, replace the "F=4" label with
the "F=6" label.
SAS cable Label color New label
New 0.5 m cable Red J4:I1:P2 - J6:I1:P1
New 0.5 m cable Green J6:I2:P2 - J4:I2:P1
Moving 2 m cable (N:S6:P2 - JF:I2:P1) White F=6
3. Cable the enclosure as shown.
Installing capacity upgrade kits 95

Table of Contents

Other manuals for HPE StoreOnce 5200

Related product manuals