EasyManua.ls Logo

HPE StoreOnce 5200

HPE StoreOnce 5200
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Item SAS cable Label colors Cable from To
6 New 0.5 m cable Red JBOD 2 IOM 1 Port 2 JBOD 4 IOM 1 Port 1
7 New 0.5 m cable Green JBOD 4 IOM 2 Port 2 JBOD 2 IOM 2 Port 1
8 Moving 2 m cable Green and white Node Slot 6 Port 2 JBOD 4 IOM 2 Port 1
4. If you are finished installing capacity upgrade kits, skip to Adding power cables.
Cabling the fourth capacity upgrade kit (JBOD 5)
The fourth capacity upgrade kit is the lowest in the rack, located directly below JBOD 3.
Procedure
1. Apply the "JBOD5" label to the top-left pull-out tag at the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. On the moving SAS cable, replace the "F=3" label with
the "F=5" label.
SAS cable Label color New label
New 0.5 m cable Red J3:I1:P2 - J5:I1:P1
New 0.5 m cable Green J5:I2:P2 - J3:I2:P1
Moving 2 m cable (N:S3:P2 - JF:I2:P1) White F=5
3. Cable the enclosure as shown.
1
2
3
4
5
6
7
8
9
Figure 32: Cabling the fourth capacity upgrade kit (JBOD 5)
94 Installing capacity upgrade kits

Table of Contents

Other manuals for HPE StoreOnce 5200

Related product manuals