Cabling the third capacity upgrade kit (JBOD 4)
The third capacity upgrade kit is located directly above JBOD 2.
Procedure
1. Apply the "JBOD4" label to the top-left pull-out tag at the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. On the moving SAS cable, replace the "F=2" label with
the "F=4" label.
SAS cable Label color New label
New 0.5 m cable Red J2:I1:P2 - J4:I1:P1
New 0.5 m cable Green J4:I2:P2 - J2:I2:P1
Moving 2 m cable (N:S6:P2 - JF:I2:P1) White F=4
3. Cable the enclosure as shown.
Figure 31: Cabling the third capacity upgrade kit (JBOD 4)
Item Description
1 JBOD 4: Third capacity upgrade kit.
2 JBOD 2: First capacity upgrade kit.
3 Server node.
4 JBOD 1: Base enclosure.
5 JBOD 3: Second capacity upgrade kit.
Installing capacity upgrade kits 93