EasyManua.ls Logo

HPE StoreOnce 5200

HPE StoreOnce 5200
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cabling the third capacity upgrade kit (JBOD 4)
The third capacity upgrade kit is located directly above JBOD 2.
Procedure
1. Apply the "JBOD4" label to the top-left pull-out tag at the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. On the moving SAS cable, replace the "F=2" label with
the "F=4" label.
SAS cable Label color New label
New 0.5 m cable Red J2:I1:P2 - J4:I1:P1
New 0.5 m cable Green J4:I2:P2 - J2:I2:P1
Moving 2 m cable (N:S6:P2 - JF:I2:P1) White F=4
3. Cable the enclosure as shown.
1
2
3
4
5
6
7
8
Figure 31: Cabling the third capacity upgrade kit (JBOD 4)
Item Description
1 JBOD 4: Third capacity upgrade kit.
2 JBOD 2: First capacity upgrade kit.
3 Server node.
4 JBOD 1: Base enclosure.
5 JBOD 3: Second capacity upgrade kit.
Installing capacity upgrade kits 93

Table of Contents

Other manuals for HPE StoreOnce 5200

Related product manuals