EasyManua.ls Logo

Huawei AR160 Series - Preparing Installation Tools

Huawei AR160 Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 3-3 Power supply requirements
Check Item Requirement
Preparation Ensure that the external power supply
system is ready before the installation.
Voltage The operating voltage of the router must be
within the normal range. For the operating
voltage range of an AR series router, see the
Hardware Description of the product.
Power outlets and power cables
l If the external power supply system
provides country-specific power outlets,
use AC power cables comply with the
local standards.
l If a DC power distribution box is used,
use DC power cables.
l Each router has its own power cables
delivered as accessories. The power
cables can only be used on the router in
the same package and cannot be used on
any other device.
3.5 Preparing Installation Tools
Table 3-4 lists installation tools to be prepared before router installation.
Table 3-4 Installation tools
Tool
Function Picture
Measuring
tape
Measures distances.
ESD wrist
strap
Prevents ESD
damages when you
touch or operate the
device or components.
Utility knife Cuts cartons or paper.
Flat-head
screwdriver
Tightens or loosens
slotted screws.
Huawei
AR100&AR120&AR150&AR160&AR200&AR1200&AR
1600&AR2200&AR3200&AR3600 series Enterprise
Routers
Hardware Installation and Maintenance Guide
3 Preparing for Installation
Issue 05 (2018-07-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10

Table of Contents

Other manuals for Huawei AR160 Series

Related product manuals