EasyManua.ls Logo

Huawei EMMA Pro - Checking before the Installation; Installing the EMMA

Huawei EMMA Pro
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.3 Checking Before the Installation
Figure 4-2 Packing list
Check
Item
Check Criteria
Outer
package
Before unpacking the product, check the outer packaging for
damage, such as holes and cracks, and check the product model. If
any damage is found or the model is not what you requested, do not
unpack the product and contact your vendor as soon as possible.
Delivera
ble
Check the number of deliverables according to the packing list and
check whether there is any obvious external damage. If any part is
missing or damaged, contact your vendor.
4.4 Installing the EMMA
Context
Install the EMMA on the DIN 35 mm standard guide rail of the AC power
distribution box in which a surge protective device must be congured.
Procedure
Step 1 Clamp the EMMA onto the DIN 35 mm standard guide rail from bottom to top,
and push the EMMA upwards.
Step 2 Fasten the EMMA to the guide rail.
EMMA-(A01, A02)
User Manual 4 Installation
Issue 05 (2024-01-19) Copyright © Huawei Digital Power Technologies Co., Ltd. 23

Related product manuals