● Bearing capacity: ≥ 10 kg
Figure A-4 Recommended dimensions
Step 1 Install a beam.
Figure A-5 Installing a beam
Step 2 Bind the Y-branch connectors on the beam.
Figure A-6 Binding Y-branch connectors
----End
SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1
User Manual
A Securing Y-Branch Connectors
Issue 05 (2020-08-30) Copyright © Huawei Technologies Co., Ltd. 105