Figure 1-6 SACU+ESS FE ber ring+PCS FE ring topology (the device in the dotted
box is optional)
1.3 O&M Methods
Table 1-3 O&M methods
O&M Method
Description Main Application Scenario Reference
Document
SmartLogger
WebUI
A PC is connected to the
SmartLogger in the SACU to
manage the ESSs, PCSs,
SUN2000s, and meters in the
array.
Deployment commissioning SmartLogge
r3000 User
Manual
SmartPVMS The SmartPVMS is deployed on
a public network. It displays the
current and historical running
status of power plants and
supports intelligent alarm
reporting, analysis, diagnosis,
and O&M.
Viewing plant information
and manage devices at a
site after deployment and
commissioning
iMaster
NetEco
V600R023C
00
FusionSolar
SmartPVMS
User
Manual
Commercial and Industrial Microgrid Energy Storage
Solution
Quick Guide (With Third-Party Microgrid Central
Controller) 1 Solution Introduction
Issue 04 (2023-12-18) Copyright © Huawei Digital Power Technologies Co., Ltd. 13