4 System Power-On and Commissioning
During the power-on procedure, power o the batteries immediately if any fault is
detected. Rectify the fault before proceeding with the procedure.
4.1 Device Power-On
4.1.1 On/O-Grid PV+ESS System
Power on the on/o-grid PV+ESS system when an external power supply is
available.