Do you have a question about the Huawei PowerCube 1000 and is the answer not in the manual?
Describes how to install the cabinet, boards, modules, and cables.
Lists the target audience for this document.
Defines the symbols used in the document.
Provides general safety instructions for installation and operation.
Specifies the qualifications and training required for personnel.
Details safety procedures related to grounding and AC/DC power.
Defines the required environmental conditions for installation.
Covers safety precautions for mechanical operations like hoisting.
Outlines safety measures for handling and installing batteries.
Provides safety guidelines for photovoltaic modules.
Details safety precautions for diesel generators (DG).
Describes available angles for PV module supports.
Details the technical specifications of the 445 W PV module.
Describes the SJB-0601A component and its specifications.
Details the exterior and interior of the ICC800-A1-C2 cabinet.
Describes the exterior of the ESC800-A1 component.
Details the interior and technical specifications of ETP48600-C5B1.
Describes the DC output box and its PDU specifications.
Details the Lithium Battery Bus Bar Box and its specifications.
Describes the appearance and function of the junction box.
Details the exterior and technical specifications of the AC Input Module.
Describes the SMU02C appearance, indicators, and buttons.
Details the UIM05D1 panel, dry contacts, and COM port definitions.
Describes the GIM module, its models, indicators, and ports.
Details the PSU appearance, function, and indicator descriptions.
Describes the SSU appearance, function, and indicator descriptions.
Details the M48500N1 power module's appearance and indicators.
Describes the PVDU-150A1 exterior, interior, and technical specifications.
Details the technical specifications of the 4G antenna.
Describes the sensor appearance and DIP switch settings.
Describes the appearance of the smoke sensor.
Explains how the water sensor detects water.
Details the ESM-48100A6 panel, ports, and indicator descriptions.
Details cable compliance, cross-sectional area, and size references.
Lists installation tools and instruments required for the process.
Specifies the required installation dimensions for cabinets.
Defines the positions and types of cable holes at the cabinet bottom.
Procedure for marking mounting holes for cabinet installation.
Steps for drilling holes and installing expansion sleeves.
Instructions for safely hoisting and installing a cabinet.
Procedure for installing the cabinet ground cable.
Steps for securing cabinets onto a concrete floor.
Optional steps to install right and left sealing plates.
Procedures for combining multiple cabinets.
Illustrates component installation positions within cabinets.
Step-by-step guide for installing a Power Supply Unit (PSU).
Procedure for installing the M48500N1 power module.
Steps for installing a DG expansion module, including SIM card.
Procedure for installing the AC input module.
Steps for installing the PVDU-150A1 in a 19-inch rack.
Instructions for installing a Solar Supply Unit (SSU).
Guide for installing the digital temperature and humidity sensor.
Steps for securing and grounding lithium batteries.
Procedure for installing battery power cables.
Instructions for connecting battery cables between cabinets.
Steps for connecting a dry contact signal cable.
Covers IP, Wireless, and BBU in-band networking.
Procedure for connecting PVDU-150A1 cables.
Details the installation of CAN communication cables.
Instructions for connecting cables between ESC800 and ICC800.
Procedure for connecting signal and power cables for a reused DG.
Steps for installing DC output power cables for ETP48600-C5B1.
Steps for installing AC input power cables for ETP48600-C5B1.
Checklist for verifying cabinet installation status.
Checklist for verifying the installation environment.
Checklist for verifying electrical connections.
Checklist for verifying cable installation and routing.
Procedure for connecting the reused DG supply.
Configuration of various system parameters.
Procedure for starting and verifying the DG self-check.
Steps for connecting the PV supply under normal sunlight.
Procedure for connecting the lithium battery supply.
Steps for connecting the load supply and observing system status.
Optional steps to install sealing plates on the cabinet base.
Procedure for installing sealing plates on combined cabinets.
Final checks, sealing holes, and locking the cabinet.
Classifies environments based on atmospheric corrosion levels.
Maps UIM dry contacts to associated alarms.
Describes how to cut cables and install terminals.
Procedures for installing floating nuts for components.