Figure 7-8 Hoisting a cabinet
Step 4 After hoisting is complete, remove the lifting eyes and reinstall the sealing nuts.
Figure 7-9 Installing the sealing nuts
----End
PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide 7 Installing the Cabinet
Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd. 76