Figure 9-2 Installing the ESM ground cable
----End
9.2 Installing Battery Cables
5 KW Scenario
Step 1 Install the battery power cables.
NO TICE
Install the negative power cables for batteries and then the positive ones.
PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide 9 Installing Batteries and Cables