10.8 Installing AC Input Power Cables for the
ETP48600-C5B1
Prerequisites
D ANGER
Ensure that the upstream AC input circuit breakers are OFF, and attach warning
labels such as "Do not operate."
Switch
o all circuit breakers before installing the power cables.
Procedure
Step 1 Prepare AC input power cables and cord end terminals.
Step 2 Connect the AC input power cables to the corresponding AC input circuit breakers.
Figure 10-17 Installing AIU03 AC input power cables
(1) Reused DG
----End
PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide 10 Installing Cables
Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd. 118

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei PowerCube 1000 and is the answer not in the manual?

Huawei PowerCube 1000 Specifications

General IconGeneral
BrandHuawei
ModelPowerCube 1000
CategoryStorage
LanguageEnglish

Related product manuals