EasyManuals Logo

Huawei PowerCube 1000 User Manual

Huawei PowerCube 1000
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background imageLoading...
Page #125 background image
10.7 Installing DC Output Power Cables for the
ETP48600-C5B1
Prerequisites
D ANGER
Switch o all load circuit breakers before installing the power cables.
Procedure
Step 1 Install DC output power cables.
Figure 10-16 Installing DC output power cables
(1) DC load
NO TE
Connect DC power cables to the circuit breaker that controls LLVD based on the load
importance and capacity. The preceding gure is for reference only.
----End
PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide 10 Installing Cables
Issue 02 (2021-09-28) Copyright © Huawei Technologies Co., Ltd. 117

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei PowerCube 1000 and is the answer not in the manual?

Huawei PowerCube 1000 Specifications

General IconGeneral
BrandHuawei
ModelPowerCube 1000
CategoryStorage
LanguageEnglish

Related product manuals