3. Turn on the power switches on the AC and DC sides of the PCS.
4. Restart the PCS. Check and ensure that no Reverse Phase Sequence on AC
Side alarm is reported.
----End
Commercial and Industrial Microgrid Energy Storage
Solution
Quick Guide (With Third-Party Microgrid Central
Controller) 4 System Power-On and Commissioning
Issue 04 (2023-12-18) Copyright © Huawei Digital Power Technologies Co., Ltd. 35