Step 3 On the MGCC side, send the startup, shutdown, and Working mode changing
commands to check that the communication between the MGCC and
SmartLogger is normal.
Step 4 Perform charge and discharge tests on the MGCC side.
1. Send a power command on the MGCC side and check whether the feedback
information sent by the SmartLogger to the MGCC is normal.
2. Choose Overview > Plant Running Info. on the SmartLogger and check
whether the meter power, ESS power, and PV power match.
----End
NO TE
The preceding steps Step 1 and Step 2 have been completed after deployment
commissioning. If a power failure occurs after deployment commissioning, perform steps
Step 1 and Step 2 to start the array.
Starting the Array Using the Black Start Function in O-Grid Mode
NO TICE
The plant design shall ensure that the inrush current of each load line does not
cause overcurrent protection after black start is successful.
The control logic of black start is implemented by the MGCC, and the power
supply for startup is the ESS.
During black start, the secondary circuits such as the SACU or SmartLogger and
the CMU of the ESS shall have a power supply, which can be provided by the
UPS.
During black start, the ESS array shall have adequate dischargeable power for
the black start (depending on the isolation transformer specications and
inrush current in the system).
To prevent PCS protection caused by the excitation inrush current when the
isolation transformer is switched on during black start, the isolation
transformer and lines also need to be started simultaneously.
If forced dehumidication of the ESS is triggered during the black start, the
black start function cannot take eect properly. Therefore, before the black
start, ensure that the ESS cabinet doors are closed in a timely manner and
there is no condensation in the ESS (for example, there is no water drop in the
ESS).
In o-grid scenarios, it is recommended that the end-of-charge SOC and end-
of-discharge SOC controlled by the EMS range from 10% to 90% to ensure that
the black start function works properly.
Commercial and Industrial Microgrid Energy Storage
Solution
Quick Guide (With Third-Party Microgrid Central
Controller) 5 System Operations
Issue 04 (2023-12-18) Copyright © Huawei Digital Power Technologies Co., Ltd. 37

Other manuals for Huawei LUNA2000-200KWH-2H1

Related product manuals