EasyManua.ls Logo

Huawei OptiXRTN 980L - STM-1 e Cable Installation; STM-1 e Cable Connection; NM Cable Installation Procedures; NM Cables for Gateway NE

Huawei OptiXRTN 980L
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Installing NM Cables
Installing the NM Cables (for a Gateway NE)
a
NMS
NMS/COM
The CSHL board provides the
NMS/COM port.
CSHL board
•Assemble a crossover cable or a straight-through cable on site.
•Ensure that the interconnected network cables do not form a loop and the standby CSHL board is not
connected to another network cable.
Installing the NM Cables (for Multiple Interconnected NEs at a Site)
b
NOTE
29