Figure 4-15 Determining the positions for drilling holes
Step 2 Drill holes using a hammer drill.
You are advised to apply anti-rust paint on the hole positions for protection.
Figure 4-16 Drilling holes
Step 3 Secure the mounting bracket.
SUN2000-4.95KTL-JPL1
User Manual 4 Installation
Issue 05 (2023-02-17) Copyright © Huawei Technologies Co., Ltd. 35