EasyManua.ls Logo

Huawei SUN2000-4.95KTL-JPL1 - Page 66

Huawei SUN2000-4.95KTL-JPL1
107 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Label Denition Description
3 CT2+ Primary
CT2+
W wire on the power grid side
4 CT2- Primary
CT2–
5 CT3+ Reserved N/A
6 CT3-
7 CT4+
8 CT4-
Procedure
Step 1 Route the CT cable terminals into the maintenance compartment through the
cable hole at the bottom of the SUN2000, connect the CT terminals based on the
cable labels.
Step 2 Locate the SUN2000 CT terminal in the
tting bag.
Step 3 Connect the prepared cord end terminals to the corresponding ports of the CT
terminal, and insert the communications terminal into the CT terminal base of the
SUN2000.
Figure 5-29 Connect the CT and CT cables
SUN2000-4.95KTL-JPL1
User Manual 5 Electrical Connections
Issue 05 (2023-02-17) Copyright © Huawei Technologies Co., Ltd. 60

Other manuals for Huawei SUN2000-4.95KTL-JPL1

Related product manuals