(1) Shielding layer of the signal cable
NO TE
The DTSU666-HW and YDS60-80 power meters support a maximum current of 80 A.
If the SUN2000-(2KTL-6KTL)-L1 are cascaded with three-phase inverters, they must be
connected to the grid in the same phase.
For a three-phase three-wire system, you need to set the cable connection mode.
Otherwise, the displayed voltage is incorrect.
Ensure that the baud rates of the DTSU666-H, YDS60-C24, DTSU71 and DHSU1079-CT
meters are set to the default values. If they are changed, meters may go oine,
generate alarms, or aect the inverter output power.
Table 5-4 Select the cable connection mode
Paramet
er
Note
Select the cable connection mode:
0: n.34 indicates three-phase four-wire. 1: n.33 indicates three-phase
three-wire.
Procedure
Step 1 Connect the signal cable to the signal cable connector.
Figure 5-30 Installing the cable
SUN2000-(3KTL-10KTL)-M1 Series
User Manual 5 Electrical Connections
Issue 17 (2024-01-12) Copyright © Huawei Technologies Co., Ltd. 67