Figure 4-41 Marking-o template (unit: mm)
(1) Rear edge of the cabinet (2) Wall
(3) Mounting holes for antiseismic kits (4) Mounting hole of the L-shaped bracket
NO TE
Pay attention to the front and back edge lines of the cabinet, preventing incorrect location.
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
1. Drill a hole into the concrete oor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
2. Slightly tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
3. Partially tighten the expansion bolt.
4. Remove the bolt, spring washer, and at washer.
NO TICE
Knock the expansion bolt into the hole until the expansion sleeve completely ts
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
UPS5000-A-(30 kVA-120 kVA)
User Manual 4 Installation and Cable Connection