Heat-shrink
tubing
Insulation tape
- -
Other Tools
Electrician's knife Hacksaw Powder marker Glue gun
Brush Paint brush Vacuum cleaner Flashlight
Hole saw
Insulation pad
SPD extracting
tool
Internal resistance
tester
4.1.3 Preparing Power Cables
● The UPS can generate large leakage currents. A circuit breaker equipped with
an RCD is not recommended.
● If multiple UPSs are to be connected in parallel, input and output power cables
for each UPS should have the same length and specications.
UPS5000-A-(30 kVA-120 kVA)
User Manual 4 Installation and Cable Connection
Issue 17 (2024-02-21) Copyright © Huawei Digital Power Technologies Co., Ltd. 65