Step 4 Push the rear handle into the groove. For details, see the instructions on the
chassis.
1. Push the handle into the groove.
2. Tighten the screws on the rear handle clockwise.
Figure 4-13 Pushing the rear handle into the groove
Step 5 Install the front panel.
1. Insert the lower end of the panel into the UPS.
2. Gently close the upper end of the panel.
Figure 4-14 Installing the front panel
Step 6 To prevent misoperations, you are advised to install a lock (diameter of the
eective lock cylinder: 5–6.3 mm) for the maintenance bypass switch.
UPS5000-A-(30 kVA-120 kVA)
User Manual 4 Installation and Cable Connection
Issue 17 (2024-02-21) Copyright © Huawei Digital Power Technologies Co., Ltd. 79