Figure 4-46 Installing a reinforced beam (front view)
Step 3 Use scale plates to determine the installation positions of oating nuts at the left
and right sides on the front of the rack, and install oating nuts.
Level the Bottom line on the scale plate with the lower edge of U sale 01 on the
rack. Install oating nuts onto the mounting holes for the mounting bar that
corresponds to Hole location lines.