UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 3-88 Connecting signal cables in a dual-bus system
Step 2 Connect signal cables for each UPS by referring to 2.3.4 Control Module.
----End
3.4 Installation Verification
Table 3-9 lists check items.
If the check results of listed items 10 and 11 in Table 3-9 do not meet the acceptance criteria,
the UPS may be damaged.
Table 3-9 Installation checklist
Consistency between system
configurations and delivery
configurations
The system configurations, including
models and the number of modules, comply
with the contract.