SR05-D1A3-PV manual v1801 15/83
2 Instrument principle and theory
Figure 2.1 Overview of SR05:
shaded areas in exploded view show ball levelling mount and shim
(1) cable (standard length 3 metres, optional longer cable)
(2) connector
(3) bubble level
(4) thermal sensor with black coating
(5) glass dome
(6) sensor body
(7) tube mount (optional)
(8) mounting screw (included with ball levelling and tube mount; requires 4 mm hex key)
(9) shim (included with and needed for ball levelling mount)
(10) ball levelling mount (optional)
(11) countersunk set screw for levelling adjustment (included with ball levelling mount;
requires 4 mm hex key)
(12) opening for Ø 25 to Ø 40 mm tube when using ball levelling and tube mount
1
2
3
4
5
6
7
8
10
11
9
12