EasyManua.ls Logo

Hunter H33 - Reefing Instructions; Reefing Procedure; Shaking Out a Reef; Spinnaker (Optional) Setup

Hunter H33
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hu
nt
e
r
33
• Sails and Ri
gg
in
g
12.
6
lift
(
if needed
)
.
12.7 Shakin
g
Out a Reef
1. Head up into the wind.
2. Ease the mainsheet and van
g
. Release the tension on
the toppin
g
. Lift
(
if needed
).
3
. Release the line stopper and remove ree
f
line
f
rom
win
c
h.
4. Tension the main hal
y
ard to raise sail, makin
g
sure ree
f
lines run
f
reel
y
while sail is bein
g
raised. Appl
y
stopper
to main hal
y
ard.
5
. Re-tension van
g
and mainsheet, ease the toppin
g
li
f
t
(
if needed
)
.
12.8 Spinnaker
(
Optional
)
To set the optional spinnaker usin
g
the dedicated hal
y
ard,
first attach the hal
y
ard to the head rin
g
on the sail. Next,
tie the tack downhaul line to the tack rin
g
, lead it throu
g
h a
turnin
g
block on the deck near the bow, and run it aft to the
c
ock
p
it. Set u
p
the tack downhaul so the tack of the sail is
abou
t
f
iv
e
in
c
h
es
abo
v
e
th
e
dec
k wh
e
n th
e
sa
il i
s
h
o
i
s
t
ed
.
Attach the spinnaker sheet to the clew rin
g
of the spinna-
ke
r
a
n
d
m
a
k
e
su
r
e
th
e
lin
e
i
s
l
ed
a
ft
ou
t
s
i
de
th
e
lif
e
lin
es
to a turnin
g
block on the toerail located
j
ust
f
orward o
f
the stern pulpit. Then run it forward to a winch allowin
g
tota
l
s
l
ac
k
i
n t
h
e s
h
eet.
Th
e s
h
eet t
h
at
i
s not
b
e
i
n
g
use
d
— the laz
y
sheet — should also be attached to the clew
o
f the spinnaker , led forward
i
n front of the headsta
y
,
a
n
d
th
e
n
bac
k
o
n th
e
o
th
e
r
s
i
de
o
f th
e
boa
t —
ou
t
s
i
de
the shrouds and li
f
elines — to another turnin
g
block
positioned
j
ust forward of the stern pulpit. Then take that
s
h
eet an
d
l
ea
d
i
t to a w
i
nc
h
, w
i
t
h
t
h
e s
l
ac
k
i
n t
h
e s
h
eet.
Now
y
ou are read
y
to hoist the spinnaker.
S
tart b
y
headin
g
off to a square run. Leave the mainsail full
y
o
ut
d
ur
i
n
g
t
h
e
h
o
i
st
i
n
g
proce
d
ure as
i
t w
ill
bl
an
k
et
the spinnaker and keep it
f
rom
f
illin
g
until
y
ou are
read
y
for it to be set. A
g
ood place to raise the sail
is from the leeward side,
j
ust ahead of the boom.
O
nce it is
f
ull
y
hoisted, slowl
y
head up to
y
our desired
c
ourse and pull in the sheet until the sail sets. Make
sure
y
ou have at least two turns of the sheet around the
win
c
h.
Now
y
ou are off and sailin
g
with
y
our cruisin
g
spinnaker.
12.5 Reefin
g
Instruction
s
1. Run both reefin
g
lines as illustrated in the boom &
ree
f
la
y
out. The shorter ree
f
line will be used on the
f
irst
reef
(
Starboard Side, Green
)
. The lon
g
er reef line on the
second reef
(
Port Side, Red
)
.
2. R
a
i
se
th
e
m
a
in
sa
il.
3
. Ease the mainsheet and van
g.
4. Lower the main sail to approximatel
y
the first ree
f
position.
5
. Take u
p
the slack in the first reef line until the tack and
th
e
c
l
e
w
a
r
e
do
wn t
o
abou
t 2”
abo
v
e
th
e
boo
m
.
6
. Ad
j
ust the main hal
y
ard so that the tack reef point is
not contactin
g
the
g
oose neck on the
f
ront o
f
the spar
and is appl
y
in
g
tension to the lu
ff
o
f
the main above the
reef, not below. There will be approximatel
y
6”
(
150mm
)
of
stretch in the main lu
ff
and main hal
y
ard when the ree
f
-
in
g
line is tensioned, so, make sure that this is allowed
for when ad
j
ustin
g
the main hal
y
ard to locate the tack
r
eef
b
l
oc
k
.
7. Confirm that the tack reef
p
oint is still clear of the tack
shackle and that onl
y
the main lu
ff
above the ree
f
crin
g
le
is tensioned, not the lu
ff
between the crin
g
le and the top
stacked sail slide. Ease the reef line and read
j
ust the
hal
y
ard i
f
necessar
y
.
8
. Mark the hal
y
ard at the stopper with 1”
(
25mm
)
sin
g
le
band o
f
indelible marker ink. B
y
droppin
g
the hal
y
ard to
this mark ever
y
time, positionin
g
is made easier. The hal-
y
ard is automaticall
y
in the correct position for the reef
.
9
. Repeat the procedure
f
or the second ree
f
, usin
g
double
bands to mark the hal
y
ard in the correct position.
12.6 Reefin
g
Procedur
e
1. Head up into the wind.
2. Ease the mainsheet and van
g.
3
. Check the toppin
g
lift for adequate boom support.
4
.
L
ower t
h
e ma
i
n
h
a
ly
ar
d
to t
h
e appropr
i
ate mar
k
an
d
snub the line with the stopper.
5
. Tension the reefin
g
line with the self-tailin
g
winch until
the reef clew is brou
g
ht down to the boom. Appl
y
stopper
and tension the main hal
y
ard back up, ease the toppin
g

Table of Contents

Related product manuals