EasyManua.ls Logo

Hunter H33 - Pre-Delivery Service Record

Hunter H33
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hu
nt
e
r
33
• D
ocu
m
e
nt
s
a
n
d
F
o
rm
s
DEALER
:
_____________________________
EN
G
INE:_________________________________
M
AKE:______________________________
_
O
WNER
:
________________________________
PO
R
T
E
NGIN
E
N
O
:
____________________
S
TBD. ENGIN
E
N
O:
_______________________
BO
A
T
A
A
NAME
:_________________________
_
R
E
G
I
ST
R
Y
R
R
N
O
:________________________
_
___
O
PE
R
A
TION___________INITIALS________
A
A
O
PE
R
A
TION____________
A
A
INITIAL
S
________
_
COMMENTS:______________________________ __________________________________________
_______________________________________________________________________________
INSPECTION DATE:____________________A
A____
DEALERS SIGNATURE: _______________________________________________________
OWNERS SIGNATURE:A
A ___________________________________________________________
BEFORE LAUNCHING
WITH BOATA
AINWAWWTERAA
13. Hose test for cabin and window leaks
14. No water leaks at thru hull fitting
with seacocks
15. No water leaks at shaft or rudder
16. With all switches offf
f - no spark when
battery cable touched to post
17. All electrical equipment operating
including: horn( ); running light( );
bilge pump( )
18. ToiletT
T operates
BEFORE STARTINGTT ENGINES
23. All engine wiring in good order & tight
24. Throttle control and cable travel
25. Clutch control and cable travel
26. Crankcase oil level at FULL mark
27. Reverse gear oil level at FULL mark
28. No fuel leaks in fuel lines, at fittings, at
fuel filter, fuel pump
29. No engine water or oil leaks
30. Oil pressure and exhaust water flow
31. Idling speed set at 700-800 RPM
and is in proper adjustment
WAWWTERAATESTBOATAA
33. Engine performance
34. Instruments are registering properly
35. TopT
T RPM wide open throttle for one
minute after warm-up
36. Boat performance
FINAL CHECK:
37. All accessory equipment operating
19. Water (pressure) system operates
20. Galley stove operates
21. With fuel tanks full, no fuel leaks at
fill pipes, overflow vent, or at
any fuel line connections
22. With coupling disconnected, engine and
shaft alignment
38. Carpets and drapes installed and clean
39. All loose equipment on boat
ready for new owner.
Pre-deliver
y
S
ervic
e
Reco
r
d
Fig.
2.1
1. Hull Side Clean and Gelcoat
2. Bright work clean and finish
3. Decks cleaned and gelcoat
4. Interior Finish
5. Upholstery clean and carpet in place
6. Bilge cleaned.
7. Bottom clean and paint
8. Both shafts turn freely
9. Engines and Generator intakes installed
10. All hull fittings sealed
11. All drain plugs tight, (hull, engines, generator, muffler)
12. Sacrificial Anodes installed
10
2.1
0

Table of Contents

Related product manuals