Hydroid – Series User Manual
18 04/19
OPERATING DO'S AND DON'TS
DO
• Change the carbon pre-filter regularly (75,000 gallons)
• Monitor the system and keep a regular log (weekly)
• Run the system at least every 72 hours for one hour or more.
• Always feed the pump with pre-filtered water.
DON’T
• Permit chlorine to enter the feed water (change carbon pre-filter
every 75,000 gallons).
• Shut down the system for extended periods (see manual page 25).
• Operate the system with insufficient feed flow or pressure.
• Operate the pump dry.
TO MAINTAIN PROPER PRESSURE, MAXIMUM HORIZONTAL TUBING
DISTANCE TO TANK STORAGE IS 50FT. IMPORTANT! FOR EVERY 5FT
VERTICAL HEIGHT, YOU NEED TO SHORTEN TUBING BY 10FT OF
HORIZONTAL LENGTH. EXAMPLE: IF TUBING NEEDS TO BE
INSTALLED 10FT OFF THE GROUND, TOTAL HORIZONTAL
LENGTH MAY NOT EXCEED 30FT. IF LENGTH EXCEEDS
SPECIFICATIONS, PLEASE CONTACT HYDROLOGIC 888-426-5644
USING THE REVERSE OSMOSIS SYSTEM OPERATION LOG PROVIDED ON
PAGE 24 OF THE USER MANUAL, RECORD YOUR SYSTEM’S READING
DAILY FOR A WEEK. AFTER A WEEK, RECORD THE READINGS AT A
MINIMUM OF ONCE A WEEK. IT IS SUGGESTED TO MAKE SEVERAL
COPIES OF THIS SHEET FOR FUTURE USE BEFORE RECORDING INITIAL
READINGS. KEEPING AN OPERATION LOG IS IMPORTANT TO
TROUBLESHOOT POSSIBLE TECHNICAL ISSUES.
IF THE SYSTEM HAS AN ANTI-SCALANT FILTER (OPTIONAL HL 11595),
AND IF THE PRODUCT WATER (PURIFIED WATER) IS USED AS POTABLE
WATER, THE BLEND VALVE MUST REMAIN CLOSED. THIS IS TO AVOID
INGESTION OF ANY CHEMICALS.