EasyManua.ls Logo

Hydropool Hot Tub - Releasing an Air Lock Procedure

Hydropool Hot Tub
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
H Y D R O P O O L I N D U S T R I E S
16
If your hot tub is equipped with the optional Remote
Above-Grade Equipment Package, you should close the
gate valves on either side of the pump, loosen off the lids
on the priming pots, fill with water, re-seal, turn on the
pumps and quickly re-open valves.
Turn the pump onto high speed and re-check for leaks. The
control system will automatically return the pump to low
speed after 15 minutes.
Adjust the hot tub heat control at the topside panel to the
desired water temperature.
Adjust water balance (pH, TA, calcium hardness) to
recommended levels and add sanitizor.
The hot tub will require 8-10 hours to reach the desired
temperature.
Keep insulated safety hard cover on the hot tub, and the
air controls closed during the entire heat up process.
Definition: ‘Priming’ a pump is a term used to describe the
process in which air trapped in the plumbing and pump
wet-end (referred to as an ‘air lock’) is released, allowing
the pump to move water efficiently through the plumbing
system and to the jets.
O-RING/ GASKET
AT UNION CONNECTIONS
…THROUGH THE
PUMP UNION
…THROUGH THE
HOSE BIB
RELEASING AN AIR LOCK…
PUMP FROST PLUG(S)
FROST PLUGS

Table of Contents

Related product manuals