EasyManuals Logo
Home>Hypertherm>Welding System>Powermax30

Hypertherm Powermax30 Field Service Bulletin

Hypertherm Powermax30
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
10 Powermax30/30 XP/30 AIR Field Service Bulletin 805430
Power Cord Replacement
Install the new power cord (CSA)
1. Are you installing a new strain relief?
If yes, insert the strain relief into the rear panel and tighten the retention nut onto the strain relief. Loosely tighten
the strain relief nut on the outside of the power supply onto the strain relief.
If no, continue with the next step.
2. Route the power cord wires through the strain relief nut and strain relief.
3. Press the connector for the black wire onto the pin on the upper left side of the power switch. Press the connector
for the white wire onto the pin on the upper right side of the power switch.
4. Tighten the green ground wire to the heatsink with a torque setting of 17.28 kg-cm (15 inch-pounds).
5. Press the wires into the track going up the side of the rear panel.

Other manuals for Hypertherm Powermax30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hypertherm Powermax30 and is the answer not in the manual?

Hypertherm Powermax30 Specifications

General IconGeneral
BrandHypertherm
ModelPowermax30
CategoryWelding System
LanguageEnglish

Related product manuals