IBM Internal Use Only
Measuring Techniques (Continued)
Example 4 28
Measured System Functions 24
Terminology 24
Monitor Probes
Assignment Planning Form 9
Attachment Points 9
Cable 10
Connecting the 9
Description 9
Extension Cable 10
Nominal Signal Delay 16
NOT Function
Connections for 13
Operational Control Panel 1 36
Operational Control Panel 2 37
Not True (+ level) 11
Ones Retention Test 22
Operating Controls 8
Operating Procedures for
Basic Counter Unit 8
1057/1058 19
Operational Control Panel 1 36
Operational Control Panel 2 37
Operator’s Panel 8
Optional Accessory, 1057/1058 Card Punch 19
OR Function
Connections for 12
Operational Control Panel 1 36
Operational Control Panel 2 37
OR LATCH Function
Connections for 13
Operational Control Panel 1 36
Operational Control Panel 2 37
Outlets
Convenience 6
Primary 6
Patch Panel
AND Function 12
Cords 11
Description 10
FANOUT Function 14
Image Card 17
LATCH as FANOUT 14
LATCH Function 13
Operational Control Panel 1 36
Operational Control Panel 2 37
OR Function 12
OR LATCH Function 13
Signal Definition 11
Test 23
Test Panel 38
Wiring the 10
XLF Panel 38
Performance Tests 22
Pin Locations 9
Plus (+1) A B C D 14
Plus (+1) E F G H 14
Power and Portability 6
Power-Off Switch 8
Power-On Switch 8
Primary Outlet 6
Probe
Assignment Planning Form 9
Attachment Points for
1130 Computing System 9
1800 Data Acquisition and Control System 9
System/360 9
Description 9
Processor Not Active 24
Program Status Word (PSW) 24
Punch Go Switch 8
Punch Ready Indicator Light 9
Rotary Switch, Counter Display 9
Self-Generated True Signals 14
Signal Cable 10
Signal, CPU or I/O 11
Signal, Patch Panel 11
Standard Accessory 9
Start Hub 15
Start Switch 8
Starting the Basic Counter Unit 8
Stop Hub 15
Stop Switch 8
Stopping the Basic Counter Unit 8
Strobe 15
Switches
Check Reset 8
Lamp Test 8
Machine Reset 8
Power-Off 8
Power-On 8
Punch Go 8
Start 8
Stop 8
Test 1 Hub 38
Test 2 Hub 38
Test Mode Indicator Light 9
Test Panel 38
Testing Procedure for
Basic Counter Unit 22
1057/1058 23
Timing Rate of Counter 16
Total Compute 24
Total Elapsed Time 24
Total Wait 24
True (- level) 12
True Signals, Self-Generated 14
Wait and Any Channel Busy 24
Wait Only 24
Wiring for
Example 1 27
Example 2 27
Example 3 28
Example 4 29
Wiring the Patch Panel
AND Function 12
FANOUT Function 14
LATCH as FANOUT Function 14
LATCH Function 13
NOT Function 13
OR Function 12
OR LATCH Function 13
42