EasyManua.ls Logo

IBM 9223-42H - Page 60

IBM 9223-42H
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 41. Removing the front screws
4. For a rack-mounted system, open the side latches (A) and pull the latches to slide the system unit fully
into the service position until the slides click and hold the system unit securely. Ensure that the screws
inside the latches are not secured to the rack.
See the following gure.
Remove the hook-and-loop fasteners that secure the cable management arms. Ensure that the cable
management arms can move freely. Ensure that the cables at the rear of the system do not catch or
bind as you pull the system unit into the service position.
Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the
rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out
more than one drawer at a time.
58
Power Systems: Common procedures for installable features

Table of Contents

Other manuals for IBM 9223-42H

Related product manuals