EasyManua.ls Logo

IBM Medium J11 - Page 61

IBM Medium J11
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Route cables through CMA baskets.
a) Route cables through the rst two baskets, ensuring minimal cable crossover to maximize space
b) Use all available space on the CMA shelf to make the rst 180º bend into the rst CMA basket.
c) Keep pairs of dual SAS cables parallel and close together.
d) After all cables (including PSU cables) are routed through the rst two CMA baskets, route them
around a 180º bend into the remaining four CMA baskets.
Chapter 4. Installation
41

Table of Contents

Related product manuals