EasyManuals Logo

IBM Power System POWER7 Series User Manual

IBM Power System POWER7 Series
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #179 background imageLoading...
Page #179 background image
v Yes: Go to step 13.
v No: Continue with the next step.
10. Did the TESTING COMPLETE, no trouble was found menu (801010) display?
v Yes: Continue with the next step.
v No: There is still a problem. Go to Problem analysis.
11. Select the Log Repair Action option, if not previously logged, in the TASK SELECTION menu to
update the AIX error log. If the repair action was reseating a cable or adapter, select the resource
associated with that repair action.
If the resource associated with your action is not displayed on the
resource list, select sysplanar0.
Note: If the system attention indicator is on, this will set it back to
the normal state. Go to step 14 on page 166.
12. Run a test on a resource that has an entry in the AIX error log, in the system verification mode. If
the test on the resource was successful, the Resource Repair Action menu is displayed.
After replacing a FRU, select the resource for that FRU from the Resource Repair Action menu. This updates the AIX
error log to indicate that a system-detectable FRU has been replaced.
Note: If the system attention indicator is on, this action will set it back to the normal state.
To select the resource for the replaced FRU, complete the following steps:
1. Select the resource associated with the repair action:
v If the repair action was reseating a cable or adapter, select the resource associated with that repair action.
v If the resource associated with your repair action is not displayed on the Resource List, select sysplanar0.
2. Click Commit after you make your selection.
Did another Resource Repair Action (801015) display?
v Yes: Continue with the next step.
v No: If the No Trouble Found menu is displayed, go to step 14 on page 166.
13.
Run a test on a resource that has an entry in the AIX error log, in the
system verification mode. If the test on the resource was successful,
the Resource Repair Action menu is displayed.
Note: The parent or child of the resource you just replaced might
also require that you run the Resource Repair Action service aid on
it.
After replacing that FRU, select the resource for that FRU from the
Resource Repair Action menu. This updates the AIX error log to
indicate that a system-detectable FRU has been replaced.
Note: If the system attention indicator is on, this action will set it
back to the normal state.
Common service procedures 165

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System POWER7 Series and is the answer not in the manual?

IBM Power System POWER7 Series Specifications

General IconGeneral
ProcessorPOWER7
L2 Cache256 KB per core
L3 Cache4 MB per core
Memory TypeDDR3
Operating SystemAIX, IBM i, Linux
VirtualizationPowerVM
Processor Cores4, 6, or 8
Form FactorRack
Release Date2010

Related product manuals