EasyManua.ls Logo

Icom IC-M71 - Page 170

Icom IC-M71
327 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM 10-7360-226-13&P
CONTAINERIZED KITCHEN (CK) 0027 00
DIRECT SUPPORT MAINTENANCE PROCEDURES
0027 00
-
1/2 Blank
COOK CENTER
THIS WORK PACKAGE COVERS:
Inspect, Repair
INITIAL SETUP
Kitchen set up, cook center not operating
Maintenance Level
Direct Support
Tools and Special Tools
Tool Kit, General Mechanic’s (WP 0052 00, Table 1, Item 1)
Shop Equipment, Welding (WP 0052 00, Table 1, Item 2)
GENERAL
This procedure contains information and instructions to keep the cook center in good working
order by inspecting and repairing its metal components and subassemblies.
INSPECT
Inspect the following cook center assemblies and components for bent or cracked sheet metal,
cracked welds, and loose or missing rivets:
Base assembly
Griddle assembly (griddle top and splash guards)
Steam table and adapter top
Cook pot cradle adapters (4)
Base rack
Burner rack
Cook pot cradles (2)
Exhaust hood and grease filters
REPAIR
Perform welding operations as described in TM 9-237, Operator’s Manual: Welding Theory and
Application.
Replace loose or missing rivets and perform sheet metal repair as described in TM 9-510, Metal
Body Repair and Related Operations.
END OF WORK PACKAGE

Table of Contents

Related product manuals