EasyManua.ls Logo

Icom IC-M71

Icom IC-M71
327 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TM 10-7360-226-13&P
CONTAINERIZED KITCHEN (CK) 0006 00
OPERATION UNDER USUAL CONDITIONS
0006 00-36
19. Place the wing jacks, with their base plates to the left, on top of the stair/ladders. Slide the
tops of the jacks under the air conditioner and secure the jacks to the stair/ladders using two
short rubber straps.
20. If the corner jacks and screw jacks were used, separate the jack bodies from the
extension/base plates. Store the corner jacks bodies, their extension/base plates, and the
screw jack bodies in their storage brackets on the left door. Ensure that the jacks and base
plates are properly secured to the brackets.
21. Stow the screw jack extension/base plates on the floor to the left of the generator and strap
them down with a short rubber strap.
22. Ensure that the ends of the two air conditioner condensation drain lines are stowed inside
the mechanical room so they will not be damaged when the doors are closed.
23. Closing the left door first, close and latch the mechanical room doors.
24. Place all three fuel cans in a Food Service Section vehicle.
END OF WORK PACKAGE

Table of Contents

Related product manuals