HEAT INTERFACE UNIT COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstra�ng
compliance with the appropriate Building Regula�ons and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer's  and complete this Commissioning Checklist will invalidate the
warranty. This does not  the customer's statutory rights.
Customer Name: Contact number:
Address:
POD HIU Model:
POD HIU Serial Number:
Heat Meter Serial Number:
Commissioned by (PRINT NAME): Date:
Company Name:
Company Address:
CONTROLS  the appropriate boxes)
Time and temperature control to 
Room thermostat and r Programmable room thermostat
Time and temperature control to hot water
Cylinder thermostat and  HIU intern controls
 zone valves
 Not required
Hot water zone valves
 Not required
 radiator valves
 Not required
 bypass to system
 Not required
HIU interlock
 Not required
ALL SYSTEMS
The primary system has been  and cleaned in accordance with guidance in CIBSE CP 1.2 before  the HIU Yes
The   system has been  and cleaned in accordance with BS7593 and the HIU  s Yes
What   system cleaner was used?
What   system inhibitor was used?  litres
Has a   system  been installed? Yes No
CENTRAL HEATING MODE measure and record:
(for direct appliances record only primary  / return in central  mode)
Primary  pressure, between primary  and return, during central   kPa
Primary  rate m³/hr Primary  pressure bar
Primary  temperature °C Primary return temperature °C
Central   temperature °C Central  return temperature °C
DOMESTIC HOT WATER MODE measure and record:
Is the  in a hard water area (above 200ppm)? Yes No
If Yes above, and if required according to the  manual, has a water scale reducer been ? Yes No
What type of scale reducer has been 
Primary  pressure, between primary  and return, during  hot water  kPa
Primary  rate m³/hr Primary  pressure bar
Primary  temperature °C Primary return temperature °C
Cold water inlet temperature °C  hot water temperature °C
Hot water has been checked at all outlets? Yes  hot water  rate l/min
ALL INSTALLATIONS
The  and hot water systems comply with the appropriate Building 
Yes
The HIU and associated products have been installed and commissioned in accordance with the manufacturer's 
Yes
The  of the boilerand system controls have been demonstrated to and understood by the customer
Yes
The manufacturer's litertature, including Commissioning Checklist and Service Record, have been explained and  with the customer
Yes
Commissioing Engineer's Signature
Customers Signature
(To    and receipt of the manufacturer's literature)
6. COMMISSIONING