EasyManua.ls Logo

InHand ISE Series - Installation Instructions; Installation; Installation Requirements; DIN-Rail Installation Guide

Default Icon
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IV. Installation
Installation Requirement
Power source requirements: 24 VDC (1248 VDC). Attention shall be paid
to power voltages.
Operating temperature: -4085
Storage temperature: -4085
Relative humidity 5%~95% (non-condensing).
Grounding resistance requirement: less than 1 Ω.
Avoid direct sunshine and keep away from heat sources or intensive
electromagnetic interference.
Inspect for availability of cable and joints required for installation.
4.1 Instruction for DIN-Rail Installation
4.1.1 DIN-Rail Mounting
Step 1: Select a place to install the device, and make sure there is sufficient space.
Step 2: Hook the upper lip of the bracket onto the DIN-rail.
Step 3: While pushing down to compress the clips, push the bottom part of the switch
towards the wall.
4.1.2 DIN-Rail Removal
Step 1: As the arrow 1 shows, pull down on the device to compress the bracket clips.
Step 2: Pull the bottom of the device away from the wall until is unsnaps from
the DIN-rail.
Step 3: Unhook the device from the DIN-rail.

Related product manuals