Inovance AM600 Series - Programming Environment and Software Installation; Operation and Maintenance; Start and Stop

Inovance AM600 Series
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Hardware requirements: A desktop PC or a laptop running Windows XP or above,
with 2 GB RAM and more than 5 GB free space on the hard disk or SSD. To ensure
performance, the CPU frequency should be above 2 GHz.
The PC can be connected with the PLC through a LAN cable. It is recommended to
use a router between the PC and PLC. That allows for longer distance and faster
󶎀
the PLC running in the workshop, for example. Therefore, a free LAN network port
in the local network and a network cable are required.
The PC can also be connected with the PLC through a USB cable. In this case, a
USB cable with a MiniUSB connector is required.
7 Operation and Maintenance
7.1 Start and Stop
Start and stop the system in the following procedure.
To start the system after the CPU module is programmed in STOP state:
.',
36/
4501
4XJUDIUP36/
1. Set Set the RUN/STOP switch to the RUN position
2. Check that the RUN indicator is steady on and green
MFK
RUN/
STOP
0
0
0
圶坚坌块坆坋圃块坒圃STOP
3. Set the RUN/STOP switch to the STOP position to stop
the system. The system can also be stopped by the host
computer.